bureau of engineering asphalt concrete streets

BUREAU OF ENGINEERING ASPHALT CONCRETE STREETS

t-trench and pavement restoration - asphalt concrete streets gary lee moore, p.e. deputy city engineer city engineer engineer of design edward arrington, s.e. kenneth r. redd, p.e. aurora r. gadbury mati laan bureau of engineering bureau of engineering electronically signed by edward arrington, s.e. on 03/09/2018 b-4768 bureau of engineering ...

get price

T-TRENCH AND RESTORATION DETAIL ASPHALT CONCRETE

t-trench and pavement restoration - asphalt concrete streets gary lee moore, p.e. deputy city engineer city engineer engineer of design edward arrington, s.e. kenneth r. redd, p.e. aurora r. gadbury mati laan bureau of engineering bureau of engineering electronically signed by edward arrington, s.e. on 02/01/2019 bureau of engineering official ...

get price

Standard Plan SP-477-2 - Bureau of Engineering

Mar 14, 2019  Standard Plan SP-477-2 - T-Trench and Pavement Restoration - Asphalt Concrete Streets. Revised on 03-14-2019 . Share this link. Send by email. Message. Send. Comments. Thank you, your comment has been submitted. First name. Last name. Your Email address is required. Your Email address is not valid.

get price

Home Bureau of Engineering

The Bureau of Engineering overseeing construction of Sixth Street Viaduct arch falsework. South Park Historic Renovation Project The Bureau of Engineering's historic renovation of South Park receives Grand Prize from the LA Business Council.

get price

03 - Bureau of Engineering Los Angeles Bureau of ...

Jun 18, 2021  Street Paved - No Curb: At locations where streets are surfaced but no curb has been installed, concrete is not permitted. If asphalt or rock and oil are used, a recorded waiver signed by the owner is required at the time the permit is applied for. Driveways of this

get price

Documents Los Angeles Bureau of Engineering Permit Manuals

Standard Plan SP-477-2 - T-Trench and Pavement Restoration - Asphalt Concrete Streets

get price

Burbank Blvd - Lankershim to Cleon ... - Bureau of Engineering

Jun 10, 2021  The proposed improvements include the construction of concrete curb, gutter and sidewalks; asphalt concrete pavement; storm drain and sanitary sewer facilities, street trees, street lighting, traffic signals and green street elements. Contact Information: For any questions regarding this project, please contact the Project Manager, Alice Kim.

get price

Technical Info Bureau of Engineering

The Bureau of Engineering offers access to specific data to Citywide users. However, please note that certain information may only be available to City employees. Standard Plans. Board Report Procedure Manual. Land Development Manual.

get price

Standard Plan SP-477-2 - Bureau of Engineering

Mar 14, 2019  Standard Plan SP-477-2 - T-Trench and Pavement Restoration - Asphalt Concrete Streets. Revised on 03-14-2019 . Share this link. Send by email. Message. Send. Comments. Thank you, your comment has been submitted. First name. Last name. Your Email address is required. Your Email address is not valid.

get price

Use of Asphalt Concrete-old Mix For Permanent Surfacing of ...

Western Hy-Grade cold asphalt concrete mixes for the permanent resurfacing of small utility cut in local streets. Field test cuts resurfaced with both products were thoroughly inspected and evaluated by both Bureau of Engineering and Bureau of Street Maintenance staff. There was no evidence of settlement, deterioration or cracking in

get price

Manual Calculation of SDRF - Bureau of Engineering

Dec 06, 2018  Manual calculation of Street Damage Restoration Fee (SDRF) should be done once Geocoding is complete. SDRF is applicable to any excavation work on asphalt concrete streets subject to a permit such as an A-Permit, B-Permit, Excavation E-Permit, Excavation U-Permit, and Sewer S-Permits in the Public Right-of-Way.

get price

Documents Los Angeles Bureau of Engineering Permit Manuals

Standard Plan SP-477-2 - T-Trench and Pavement Restoration - Asphalt Concrete Streets

get price

Burbank Blvd - Lankershim to Cleon ... - Bureau of Engineering

Jun 10, 2021  BURBANK BLVD. STREET IMPROVEMENTS PROJECT. Project Description: The project will improve approximately 0.7 miles of Burbank Boulevard from Lankershim Boulevard to Cleon Avenue by adding a striped bike lane on each side of the street, provide safety improvements, promote surface run off capture, and improve Burbank Boulevard to conform to the City's general plan.

get price

City of Los Angeles - Department of Public Works - Bureau ...

Cold Mill Asphalt Concrete Pavement (t= 2 in. ... Asphalt Concrete Pavement (t=6 in.) - Side Streets ... City of Los Angeles - Department of Public Works - Bureau of Engineering DETAILED RESULTS CITY ENGINEER'S ESTIMATE HYM ENGINEERING, INC. ACCESS PACIFIC, INC. ELECNOR BELCO

get price

How We Rate City Streets Bureau of Street Services

The Street Network Can be classified by two types of surface: Asphalt Concrete covers 5,840 miles of streets; Portland Cement Concrete covers 493 miles of streets; Non-Residential vs. Residential. Non-Residential Streets represent 2,600 miles of the street network (Primary Arterials, Secondary Arterials and Collector Streets).

get price

Index of Standard Drawings Standard Drawings Details ...

Asphalt Concrete Pavement Repair Adjacent to Curb. P-506. Asphalt Drainage Curb. ODOT RD701. Asphalt over Concrete Streets, Trench Resurfacing. P-516. Assemblies, Temporary Test/Sampling Point. P-740. Assembly, Fire Hydrant.

get price

Permits Bureau of Engineering

Jun 15, 2021  Notice to Los Angeles Bureau of Engineering Industry Professionals. If you are compensated to interact with the Los Angeles Bureau of Engineering, City law may require you to register as a lobbyist and report your activity. Any individual may qualify as a lobbyist, regardless of occupation, education, training, or professional title.

get price

Construction Documents Design + Construction The City ...

Apr 20, 2020  06-01-21. Material Submittals Lists. Effective Date. Construction Products List (PDF) 06-08-21. CPL Product Review Form (Doc) 05-01-14. Stormwater Facility Topsoil Vendor and Hauler List. 02

get price

Charter - clkrep.lacity

May 31, 2018  Bureau of Engineering to develop a standard for concrete street excavations similar to Asphalt Streets (S-477). • Age Exemption in Place: We ask that the SDRF exemption for streets past their useful life remain in place. Companies should not have to pay a fee for excavating streets that have a useful life of zero years.

get price

State of Illinois Illinois Department of Transportation

Roads and Streets and the Bureau of Research. Distribution ... AC- Asphalt Concrete ... AE / BAE- Airport Engineering, Bureau of A AEMA- Asphalt Emulsion Manufacturers Association AER- Annual Evaluation Report prepared by BSPE AER / AERO / DOA- Aeronautics, Division of A

get price

Excavation U Permits - Los Angeles Bureau of Engineering ...

Jul 08, 2021  The Bureau of Contract Administration (BCA) and the City Engineer will make periodic site visits to make this determination. What is subject to the Street Damage Restoration Fee (SDRF)? The SDRF is applicable to any excavation work on asphalt concrete streets subject to a permit such as an A-Permit, B-Permit, E-Permit, U-Permit and S-Permit.

get price

SEC. 62.05. EXCAVATIONS IN AND ADJACENT TO STREETS -

Mar 06, 2016  2. Actual Cost Permits. The fee to process a (U) or (E) excavation permit for an excavation of more than 1,000 square feet in area, or to process a (U) or (E) excavation permit for an excavation of 1,000 square feet or less in area where the Bureau of Engineering determines that due to the complexity of the permitted work it would cost more to issue and administer a permit than would be ...

get price

Manual Calculation of SDRF - Bureau of Engineering

Dec 06, 2018  Manual calculation of Street Damage Restoration Fee (SDRF) should be done once Geocoding is complete. SDRF is applicable to any excavation work on asphalt concrete streets subject to a permit such as an A-Permit, B-Permit, Excavation E-Permit, Excavation U-Permit, and Sewer S-Permits in the Public Right-of-Way.

get price

Excavation U Permits - Los Angeles Bureau of Engineering ...

Jul 08, 2021  The Bureau of Contract Administration (BCA) and the City Engineer will make periodic site visits to make this determination. What is subject to the Street Damage Restoration Fee (SDRF)? The SDRF is applicable to any excavation work on asphalt concrete streets subject to a permit such as an A-Permit, B-Permit, E-Permit, U-Permit and S-Permit.

get price

State of Illinois Illinois Department of Transportation

Roads and Streets and the Bureau of Research. Distribution ... AC- Asphalt Concrete ... AE / BAE- Airport Engineering, Bureau of A AEMA- Asphalt Emulsion Manufacturers Association AER- Annual Evaluation Report prepared by BSPE AER / AERO / DOA- Aeronautics, Division of A

get price

Public Hearing - Home Department of City Planning, Los ...

asphalt and concrete (alternative paving materials) in driveways and parking lots is not ... the Bureau of Engineering, Bureau of Street Services, Department of Building and Safety, Department of City Planning, Department of Public Works Sanitation, and the ... 200 N. SPRING STREET, 7th FLOOR LOS ANGELES, CA. 90012 SIGNATURE (Official) DATE ENV ...

get price

State of Illinois Illinois Department of Transportation

Jul 01, 2017  The Bureau of Local Roads Streets maintains archived copies of the manual since ... the tack coat to the new asphalt concrete immediately following the final rolling while the pavement is still warm. The emulsion (a 50/50 ... Engineering scale Planwheel All of these provide certain pros and cons. The larger the scale on

get price

Index of Standard Drawings Standard Drawings Details ...

Asphalt Concrete Pavement Repair Adjacent to Curb. P-506. Asphalt Drainage Curb. ODOT RD701. Asphalt over Concrete Streets, Trench Resurfacing. P-516. Assemblies, Temporary Test/Sampling Point. P-740. Assembly, Fire Hydrant.

get price

Magnolia Boulevard (North) - Bureau of Engineering

During construction, one lane in each direction will be maintained and on-street parking will not be available. Construction will include grading, shoring, and resurfacing, as well as concrete forming and concrete pouring. Approximately 6 street trees will be planted. In addition, power poles and other utilities will be relocated as needed.

get price

Charter - clkrep.lacity

May 31, 2018  Bureau of Engineering to develop a standard for concrete street excavations similar to Asphalt Streets (S-477). • Age Exemption in Place: We ask that the SDRF exemption for streets past their useful life remain in place. Companies should not have to pay a fee for excavating streets that have a useful life of zero years.

get price

BOARD OF PUBLIC WORKS C L Angeles DEPARTMENT OF

Nov 24, 2015  California BUREAU OF ENGINEERING KEVIN JAMES PRESIDENT MONICA RODRIGUEZ vice president GARY LEE MOORE, PE, ENV SP ... curb gutter and portion of the asphalt concrete paving. ... The information in this report has been coordinated with the Bureau of Street Services and the Bureau of Street Lighting. Please contact me at (213) 485-4935 or ...

get price

Best Practices Handbook on Asphalt Pavement Maintenance

larger manual covering both concrete and asphalt, meant for office use) was developed with input from city, county, and state engineers, and customized to include thost: issues and distresses most found in Minnesota. Information from the manuals was used to develop Tables 3-1 through 3-3 in Chapter 3.

get price

Doing Business Manuals and Guides

Oct 07, 2016  Resources Home Manuals Guides. The following is a list of manuals and guides, which includes instructional materials such as Special Provisions and Type, Size, and Location documents.

get price

Office of the City Engineer

Aug 31, 2015  (a) 6th Street: Construct an 8-foot wide concrete sidewalk with 4-foot wide parkway and integral curb and gutter. 1. 2. Construct additional asphalt concrete pavement along the southwesterly side of 6th Street sufficient to complete a 33-foot wide half roadway. 3. Construct access ramps at the intersections with Bixel Street and with Saint Paul ...

get price

REGULATIONS FOR OPENINGS, CONSTRUCTION AND REPAIR

MORATORIUM STREET - Any street that has been constructed with a concrete surface/base within ten (10) years or resurfaced with asphalt within five (5) years. The 10-year and 5-year periods shall commence upon CDOT’s declaration. NON –MORATORIUM STREET – Any street that is not within the 5-year or 10-year moratorium period.

get price

ESM Standard Details - City of Orlando

ENGINEERING BUREAU ... concrete and steel reinforcement shall be the same as concrete construction. For concrete construction, the ... ASPHALT 8" OR CONCRETE 8 " ANGLE OF PAD WITH DRIVING LANE SHALL ALLOW FOR A STRAIGHT-LINE MANEUVERING DISTANCE OF 50 FT. EXPANSION JOINT 12/19/2008

get price